Construction Management At-Risk:
Wastewater Treatment System Modifications

Owner: Precision Twist Drill
Location: Rhinelander, Wisconsin

Wastewater Treatment System ModificationsA sampling program conducted at this facility indicated that the molybdenum concentration in the wastewater generated from the Owner’s aqueous cleaning machines was sufficient to cause the elevated molybdenum concentrations being observed in the City of Rhinelander’s treatment plant biosolids. Gannett Fleming, Inc. (GF Inc.) performed bench-scale testing of the Owner’s wastewater and established an effective physical/chemical treatment process by which greater than 90 percent of total molybdenum was removed. It was determined that by instituting this treatment process, the Owner would be eliminated as a source of molybdenum in the City’s treatment works biosolids. Therefore, under a separate contract with the Owner, GF Inc. designed a full-scale wastewater treatment system consisting of flow equalization, chemical treatment, filtration through a filter press, and pH neutralization. The integration of a Programmable Logic Controller into the control system allows operation of the wastewater treatment system either automatically or manually. GFPDC provided construction/installation services for the complete wastewater treatment system.

Wastewater Treatment System ModificationsGFPDC's CM@Risk Services:

  • Negotiating with, hiring, and coordinating the structural, mechanical, and electrical subcontractors required for the job
  • Performing construction administration and oversight
  • Selecting/ordering the major pieces of equipment

 

 

 